Walkthrough systems

Contact

Walkthrough systems

This system is a very practical combination of the Artilan scaffold system and the Artilan work bridges Triangle Bridge®.

A perfect and safe alternative to the flat bridge and/or sliding board.

It can achieve a maximum work bridge span of 17m between two scaffold towers, using the specially developed Artilan transition sets.

 

Application

For projects where a large span is desired. Such as renovations, exterior insulation, low- & high-rise construction, and for performing work in hard-to-reach places, such as above a swimming pool, large conservatory, extension, or in production halls.

THE ADVANTAGES AT A GLANCE:

  • Relatively quick to set up. In 2½ hours, a 40m work bridge span at a height of 4m can be built and ready for use.
  • Ideal for performing work in hard-to-reach areas.
  • Since the Artilan through-frame system is relatively quick to set up, significant time savings can be achieved in climbing. For example, painters can see a productivity increase of at least 35%, and plumbers could see a productivity increase of 60% in time.

TECHNICAL INFORMATION:

  • If the supplier of your own (scaffold) tower can provide written assurance that your scaffolds also meet the EN1004-1 standard, you can safely suspend the Artilan work bridges Triangle Bridge® between your own scaffolds using the Artilan (Claw) Transition Set.
  • The Artilan Claw Set consists of 2 right parts + 2 left parts; therefore, one set is for use between 2 scaffold towers. The maximum work bridge span with the Artilan Claw Set between 2 scaffold towers is 12m.
  • The Artilan Transition Set includes 4 pieces of railing tube. With the Artilan transition set, the maximum work bridge span between 2 scaffold towers is 16m, or 17m if the transition set is included.
Assembly Instructions