Nothing beats an Artilan Triangle Bridge®, made from strong and very light aluminium. The system is safe, easy to use, and simple to set up and take down. The Artilan Triangle Bridge® offers you the most varied work bridge span, regardless of the project.
Often copied, but never equalled. Choose the well-thought-out original, choose the Artilan work bridge system Triangle Bridge®.
Triangle Bridge®
Furthermore, the Artilan Triangle Bridge® is perfectly combinable with Artilan quick-build rolling scaffold towers or with your own scaffold towers, provided they meet the EN1004-1 standard. You can also combine the system with the Artilan protective system, making it possible to work in the rain. Incidentally, the work bridge system Triangle Bridge® is also suitable for roof work.
By using the Triangle Bridge®, significant savings in climbing time can be achieved. Plumbing, renovation, and painting companies, among others, can achieve a productivity increase of 45% or more. You no longer need to fill the entire façade with scaffold material. No, with the Artilan Triangle Bridge®, you only build your work floor where you need it.
The advantages at a glance:
- Quick and easy to assemble.
- Within approximately 10 minutes, 5m and 12m can be assembled and ready for use in about 23 minutes.
- Doors and windows on the ground floor remain clear. The floor is where you need it.
Existing garden fences, bay windows, canopies, ponds, swimming pools, etc., are no longer a problem.
Minimal disturbance to residents.
- Low risk of burglary.
- Very solid, GS-certified construction.
- Quality handler CE.
- Click the work bridge span just above the ground into the system and, complete with floor panels and railings (also available with ladder passage), hoist it to the desired floor height.
TECHNICAL INFORMATION:
- Very lightweight, ensuring compliance with ARBO requirements at all times.
- The maximum work bridge span on 2 supports (legs) is 12½m.
- Supports are available in type 1½ to 2¼ (Traditional model), Phoenix model with hand winch in type 3 to 5m, and type 4 to 7m.
The minimum/maximum floor height of the support is adjustable in increments of 22 cm.
- Work bridge spans of 5 and 6m are ideal for carrying out work on a single-family home.
- The work bridge sections are available as standard in 1 - 2 - 2½ - 3 - 4 - 5 and 6m bridge sections.
- The most varied combinations of work bridge spans can be made.
- The maximum weight on the bridge with a work bridge span of 12m is 700 kg, evenly distributed.
- Easily secured by placing a lock on the locking pin.
- Current models are, of course, interchangeable with the first models from 1993.